Sl. No. Subject NRO File Number Date of receipt in NRO Date of Intimation to State Government File Number of State Govternment/Nodal Officer
1 Diversion of 3.381 ha of forest land for 4 laning of Ludhiana Talwandi section from km. 87.800 to km. 88.900 section NH-95 in the state of Punjab (the forest land of 12.04 ha has already directed vide MoEF, Chandigarh Letter no. 9PBC311/2015-CHA dated 06.01.16 for four lane of Ludhiana-Talwandi from km. 85.980 to 92.00 of NH-95) in the state of Punjab under forest division & distt.Ludhiana. 9-PBB339-2017-CHA 28 March, 2017 03 April, 2017 FCA/1980/373/2016/9736
2 Revised diversion of 0.083403 ha (already approved) of forest land in favour of HPCL for (Acceleration/Deceleration Lanes) approach road for existing retail outlet (HPCL) on NH-1 A, at village Beas on Pathankot-Jalandhar Road Near KM at 16.886 L/s under Forest Division and District Jalandhar, Punjab(CoCP No. 143 of 2010) 9-2160-2004-CHA 28 March, 2017 03 April, 2017 FCA/1980/302/2015/9876
3 Diversion of 0.005944 ha of forest land for approach road to Residential Colony Namely Bhagwati Enclave on Ferozepur city to Satyewala byepass R/s at village Satyawala under forest Division and district Ferozepur (9-PBB463/2014-CHA) 9-PBB463-2014-CHA 28 March, 2017 03 April, 2017 1980/71/2013/1874
4 Diversion of 0.519 hectares of forest land for laying undel"gnJuml pipe line in vill. Halowal, Alamwal, Jhanjowal, Gangowal and Chak Nadal under Forest Division and Distt. Garshankar, Distt. Hoshiarpur, Punjab 9-PBB488-2009-CHA 28 March, 2017 03 April, 2017 FCA/1980/4303/9792
5 Diversion of 0.0051 ha of forest land for setting up a new petrol pump on Pandori mohanta Gurdaspur road km. 1-2 L/s at village Talibpur, Tehsil Gurdaspur forest division distt. Gurdaspur.(By Essar Oil Ltd.) 9-PBB492-2016-CHA 28 March, 2017 03 April, 2017 FCA/1980/335/2016/9094
6 Diversion of 0.01190 ha (instead of 0.02137 ha) of forest land for approach road residential colony Gillo Valley on Ferozepur Kacha Zira road km. 1-2 R/s under Forest Division and District. Ferozepur (9-PBB461/2014-CHA) 9-PBB461-2014-CHA 31 March, 2017 06 April, 2017 1980/19/2013/1873
7 Diversion of 0.1134 ha of forest land for PSPCL for construction of 66 KV line 132 KV G/S/S Ferozepur to 66 KV G/S/S Mallanwala S/C on D/C Tower's under Ferozepur Division 9-PBB351-2017-CHA 31 March, 2017 06 April, 2017 FCA/1980/39/2017/10012
8 Diversion of 0.03115 ha of forest land for approach road to retail outlet of IOCL at KM 18.785 (LHS) in village Phuglana on Phagwara-Hoshiarpur road on NH-344B under forest division Hoshiarpur 9-PBB353-2017-CHA 31 March, 2017 06 April, 2017 FCA/1980/34/2017/9988
9 Diversion of 0.013 hectares of forest land for approach road to Mill on Bhawanigarh-Kotshamir road Km. 86-87 LIs Mour Mandi (MIs Rama Krishana Spintex Mill) under Forest Division and District Bhatinda, Punjab 25-231-2013-ROC 31 March, 2017 06 April, 2017 FCA/1980/4703/9897
9 Diversion of 0.149 ha of forest land for approach road to retail outlet of M/s HPCL on Bathinda to Mana road SH-17 at village Katshamir Between km. 13-14 LHS teh. & Distt. Bathinda. 9-PBB303-2017-CHA 31 March, 2017 07 April, 2017 FCA/1980/299/2016/9225
10 Diversion of 3.49 ha of forest land (from RD 9600 to RD 23281 of I-R Minor for construction of access road (100 feet wide) connecting Dhanansu Focal Point to Chandigarh-Ludhiana Highway (NH-44) starting from village Ramgarh (RD 9600 of 1-R Minor) District Ludhiana, Punjab by shifting 1-R Minor to Right hand side, within the irrigation land boundary. 9-PBB313-2017-CHA 31 March, 2017 07 April, 2017 FCA/1980/372/2016
11 Diversion of 2.9814 ha (2.876 ha in Patiala Forest Division + 0.1054 ha in Ludhiana Forest Division) of forest land for construction of Eastern Dedicated Freight corridor starting from Ludhiana in Punjab to Dahankuni in West Bengal and from Dadri to Mumbai (Section of CPM/Ambala) Sehnewal to Talheri via Ambala, Jagadhari and Saharunpur under Forest Division and District Patiala & Ludhiana 9-PBB435-437-2016-CHA 31 March, 2017 07 April, 2017 FCA/1980/372/2016
12 Diversion of 4.45 ha of forest land in favour of Executive Engineer, Construction Division No. 1 PWD B&R Kapurthala for construction of road widening from Kapurthala to Subhanpur km 0 to 11.40 B/s under forest division Jalandhar Distt Kapurthala 9-PBB352-2017-CHA 31 March, 2017 07 April, 2017 FCA/1980/51/2017/9976
13 Diversion of 0.01104 ha of forest land for approach road to retail outel Essar Oil Ltd., on Thikriwala-Barnala road km. 4-5 R/s at village Thikriwala under forest division Sangrur & Distt. Barnala. 9-PBB305-2017-CHA 17 March, 2017 14 April, 2017 FCA/1980/320/2016/9226
14 Diversion of 5.0064 ha (1.3363 ha in Amirtsar Division + 1.522 ha in Jalandhar Forest Division + 1.20 ha in Ludhiana Forest Division + 0.5295 ha in Sangrur Forest Division) of forest land in favour of NRSS XXIX (B) for construction of 400 kv D/c transmission line from PGCIL substation at Malerkotla to PGCIl substation at Amritsar under Forest Division Amritsar, Jalandhar, Ludhiana and Sangrur 9-PBC367-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/221-261-272-2015/22-2016/5709
15 Diversion of 0.0910 ha of forest land for construction of LILO of 220 kv line Patran-Rajla line and 220 kv patran-kakrala at 400 kv s/s PGCIl Patran on Multi Ckt tower under forest division and distt. Patiala. 9-PBB417-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/230/2016/6810
16 Diversion of 0.0038 ha of forest land in favour of m/s Kamal Milk food for construction of approach road to villageBhawanigarh tehsil Derabassi on derabassi-Barwala road km 5-6 R/s under forest division and distt. SAS Nagar. 9-PBB467-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/PBIP/264/2016/8046
17 Diversion of 2.36 ha of forest land in favour of Provincial Division PWD B&R Bathinda for construction of ROB at level X-ing C-221-Bathinda-Delhi Rail In X-ing Maur-Talwandi road Nh-254 at km. 104.95 falling Distt. Bathinda. 9-PBB469-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/142/2016/8080
18 Diversion of 0.05527 ha of forest land in front of 2.5 MW Grid connected Solar Power Plant on Canal Top on Build operate & OWN (BOO) Basic under NRSE policy-2012 on Ghaggar Branch Canal L.H.S. RD 40000 to 65000, village Nadampur, under forest division and distt. Sangrur. 9-PBB472-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/275/2012/8090
19 Diversion of 0.0007 ha of forest land in favour of M/s Sam Solar Pvt. LTd., for 2.5 MW Grid Connected Solar Power Plant on top on build operate & Own *BOO) Basic under NRSE policy 2012 on Sidhwan Branch canal between RD 1000 ft. 12000 ft. At village Ajnoud under forest distt. Ludhiana. 9-PBB473-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/276/2016/8088
20 Diversion of 0.01374 ha of forest land for approach road to M.R. International School at village-Panam on Ropar-Balachaur-Hoshiarpur road km. 46-47 L/s Tehsil Garhshankar, under forest division Nawanshahar at Garhshankar and distt. Hoshiarpur 9-PBB474-2016-CHA 30 March, 2017 14 April, 2017 FCA/1980/312/2016/9007
21 Diversion of 0.0065 ha of forest land for approach road to Mittal Resorts PVt. Ltd. On Moga KKP road km. 22-23 L/s at vill. Rajeana Distt. Moga and under forest division Faridkot at Sri Mukatsar Sahib. 9-PBB330-2017-CHA 30 March, 2017 14 April, 2017 FCA/1980/369/2016/9524
22 Cutting of trees for construction of service road on Already Diverted forest land (106.2674) 208.600 to 209.405 km under the project development to four lane of Tapa to Bathinda Section on NH-63 (New NH07) from existing km. 168.00 to 208.500 B/s under forest division Bathinda. 9-PBB310-2017-CHA 10 April, 2017 20 April, 2017 FCA/1980/258/2016/9469
23 Diversion of 6.53 ha forest land required for widening ot 4-lane from km. 375.800 to km. 382.00 of NH-10 Section Abohar-Fazilka road Passing through Abohar Town in the State of Punjab Distt. Fazilka. 9-PBB324-2017-CHA 10 April, 2017 20 April, 2017 FCA/1980/15/2017/9564
24 Diversion of 1.725 ha of forest land for raising & strengthening to Km 372.900 to 376.240 & in km. 382.540 to 385.190 section Abohar-Usmankhera Nh-15 (New Nh-62) under Muktsar forest division. 9-PBB328-2017-CHA 10 April, 2017 20 April, 2017 FCA/1980/00/2017/9594
25 Diversion of 0.0013 ha of forest land in favour of M/s ABRYL Laboratories pvt. Ltd., for construction of approach road to Manufacturing unit of village-Bhagwanpur on Jarol-Rampur Sainian road (ODR 43) km. 23.400 L/s under forest division SAS Nagar. 9-PBB335-2017-CHA 10 April, 2017 20 April, 2017 FCA/1980/PBIP/362/2016/9710
26 Diversion of 0.005 ha of forest land for construction of approach road to Commercial Colony along at Dasuya on NH-1 Jalandhar Pathankot road km. 56-57 L/s under Forest Division and distt Dasuya Punjab 9-PBB403-2016-CHA 10 April, 2017 20 April, 2017 FCA/1980/104/2016/6524
27 Diversion of 1.62 ha of forest land in favour of PWD B&R, Central Works Division, No. 2 of Bathinda for 4-laning of NH-64 (new NH-7) from 119.135 to 151.890 R/s & 150.305 to 151.890 L/s under forest division Sangrur & Distt- Barnala. 9-PBB406-2016-CHA 10 April, 2017 20 April, 2017 FCA/1980/186/2016/6517
28 Diversion of 0.378 ha of forest land for laying RCC Pipeline for supply of Raw water to water supply scheme under forest divsiion ferozepur. 9-PBB323-2016-CHA 14 April, 2017 21 April, 2017 FCA/1980/360/2015/5131
29 Diversion of 0.0106 ha of forest land permission for approach road to show room of smt Tripta Rani & Smt. Veena Gupta on Northern Byepass km. 3-4 L/s Patiala Tehsil and Distt. Patiala under forest division Patiala, Punjab. 9-PBB489-2016-CHA 14 April, 2017 25 April, 2017 FCA/1980/209/2016/9087
30 Diversion of 0.0026 ha of forest land for permission for permission road to the M/s Takiyar Bhart Gas at Bassi Pathana on Bassi Pathiana to Songhal road km. 0-1 L/s Tehsil-Bassi Pathiana under forest division SAS Nagar and Distt. Fateggarh Sahib. 9-PBB457-2016-CHA 14 April, 2017 25 April, 2017 FCA/1980/250/2016/7304
31 Diversion of 13.3062 ha of forest land for construction of four lane (patiala access controlled of Loddowal bypass linking Nh-95 with Nh-1 via Laddowal Seed farm at Ludhiana from Km. 0.000 to Km 17.041 under NHDP-VII. In the state of Punjab on Hybrid annuity Mode under forest division and distt. Ludhiana. 9-PBC445-2016-CHA 14 April, 2017 25 April, 2017 FCA/1980/291/2016/7189
11 Diversion of 2.9814 ha (2.876 ha in Patiala Forest Division + 0.1054 ha in Ludhiana Forest Division) of forest land for construction of Eastern Dedicated Freight corridor starting from Ludhiana in Punjab to Dahankuni in West Bengal and from Dadri to Mumbai (Section of CPM/Ambala) Sehnewal to Talheri via Ambala, Jagadhari and Saharunpur under Forest Division and District Patiala & Ludhiana 9-PBB435-437-2016-CHA 10 April, 2017 25 April, 2017 FCA/1980/372/2016
12 Diversion of 9.527 ha of forest land for widening of Bhadurgarh seel Ghanour Shambhu road Km. 0-28 B/s under forest division Patiala Teshil Rajpura & Distt. Patiala. 9-PBC326-2017-CHA 10 April, 2017 25 April, 2017 FCA/1980/375/2016/9544
13 Diversion of 3.3083 ha (2.2606 ha + 1.047672 ha) of forest land in favour of NRSS XXXI (B) Transmission ltd., for construction of 400 k.v D/c Kurukshetra - Malerkotla Transmission line PGCIL Sub station at Malerkotla to PGCIL Sub station kurukshetra under forsest division and distt. Patiala and Sangrur. 9-PBB361-2016-CHA 10 April, 2017 27 April, 2017 FCA/1980/11-43-2016/5562
14 Diversion of 1.20 ha of forest land for project of widening from two lane of four lane in km. 330.00 to 331.00 of NH-15 (New Nh 7) section gidderbaha-Malout road,City protion Malout under forest division Sri Muktsar Sahib. 9-PBB340-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/07/2017/9623
15 Diversion of 0.00232 ha of forest land for access road to M/s ALW Lighting India Pvt. Ltd. At Village Bhatha Dhur on Ludhiana-Sidhwan Bet road km. 18-19 L/s Tehsil Jagroan, under forest division and distt Ludhiana 9-PBB462-2016-CHA 13 April, 2017 27 April, 2017 FCA/1980/PBIP/184/2016
16 Diversion of 1.20 ha of forest land for construction of road widening from Mukerian Hydel Channel km. 0 to 15 L/s, under forest division Dasuya Distt. Hoshiarpur. 9-PBB478-2016-CHA 13 April, 2017 27 April, 2017 FCA/1980/350/2016/9019
17 Diversion of 0.2652 ha of forest land for PSTCL for laying of Dc Towers under 220 kv line from 400 KV sub station Mukatsar to Kotkapur (Sandhwan line in forest diviskon and distt. Faridkot) 9-PBB308-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/220/2016/9479
18 Diversion of 0.0297 ha of forest land for access road to the proposed retail outlet for Essar Oil Ltd., situated at village Ram Nagar, Between km. 87.000-88.000 )RHS) on Sh-12A on Bathinda-Maur Mandi & Dist. Bathinda under forest division Bathinda. 9-PBB341-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/343/2016/9704
19 Diversion of 0.8284 ha of forest land in favour of State Transmission cororation ltd for laying 220 kv transmission line Makhu to Algon line forest divison Ferozpur. 9-PBB309-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/331/2016/9474
20 Diversion of 0.685 ha of forest land in favour of Executive Engineer pb w/s & Sewerage Divn. No. 1, Bathinda for laying Sewerage pipeline for Maur Mandi on Mans-Bathinda Road road between Km. 84.250-85.850 R/s under forest division and distt. Bathinda. 9-PBB458-2016-CHA 13 April, 2017 27 April, 2017 FCA/1980/205/2016/7316
21 Diversion of 0.685 ha of forest land in favour of Executive Engineer pb w/s & Sewerage Divn. No. 1, Bathinda for laying Sewerage pipeline for Maur Mandi on Mans-Bathinda Road road between Km. 84.250-85.850 R/s under forest division and distt. Bathinda. 9-PBB458-2016-CHA 13 April, 2017 27 April, 2017 FCA/1980/205/2016/7316
22 Diversion of 14.44 ha of forest area in favour of PWD B&R Central Works division No.2 Bathinda for Up-gradation of Maur-raman road from vill Maur (from Maur ROB) to Talwandi Sabo Km. 105.890 to 124.825 B/s under forest division Bathinda and distt. Bathinda, Punjab. 9-PBB329-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/28/2017/9589
23 Diversion of 1.54 ha Forest land in favour of Executive Engineer, Central Works Division No.1, Division PWD (B&R) Bathinda for upgradation proposed four lane road (NH-15) section Bathinda-Gidderbaha-Malout Road RD km. 292.00 to 293.100 B/s falling under Distt & Forest division Bathinda. 9-PBB334-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/04/2017/9628
24 Diversion of 4.41 ha of forest land for the pupose of 4-lanning of NH-15 (New Nh 54) Amritsar to Bathinda in Existing km. 166.925 to km 221.380 section Harike-zira-faridkot under freozepur 9-PBB332-2017-CHA 13 April, 2017 27 April, 2017 FCA/1980/377/2016/9609
25 Diversion of 0.0862 ha of forest land for approach road to retail outlet (M/s Essar Oil ltd.) at Village Chabba on Amritsar-Tarantarn road NH-15 (New NH-54) RD km. 114.577 R/s Tehsil and Distt Amritsar 9-PBB359-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/139/2015/5543
26 Diversion of 0.0045 ha of forest land for approach road to Tarzen Wet & Wild Pvt.Ltd., (Picnic spot) at vilage Jain Situated on Chandigarh road km. 115-116 L/s under forest division and distt. Hoshiarpur. 9-PBB416-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/PBIP/148/2016/6804
27 Diversion of 0.004658 ha of forest land permission for passage to Jashan Restaurant & Banquet Hall on Patiala Bhadson road km. 2-3 L/s under Forest Division and Distt. Patiala. 9-PBB485-2014-CHA 17 April, 2017 27 April, 2017 FCA/1980/529/2012/1921
28 Diversion of 0.0039 ha of forest land for approach road to the diamond resort situated at vill. Dipewal, Tehsil-Sultanpur Lodhi, P.O.Wara Jodh Singh Wala, Distt. Kapurthala, under forest division and distt. Jalandhar. 9-PBB486-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/230/2015/9076
29 Diversion of 0.4470 ha of forest land in favour of M/s KJP & Associates (Existing Industry) for construction of service road at village Basma Sub Tehsil Banur on Kharar-Banur-Tapla road (NH 0205-A) L/s under forest division and distt. SAS Nagar. 9-PBB487-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/193/2016/9059
30 Diversion of 0.066 ha of forest land for construction of Dehlon Bye Pass (Lenght km. 0.00 to 2.84) on Ludhiana-Malerkotala road at km. 18+750 to 20+800 under forest division & Distt Ludhiana. 9-PBB338-2017-CHA 17 April, 2017 27 April, 2017 FCA/1980/16/2017/9746
31 Diversion of 0.826 ha of forest land in favour of PSTCL for construction of 220 kv transmission line from 400 kv sub-station Nakodar to 220 kv Sub-station Ladowal on DC Towers under forest divison &Distt Jalandhar. 9-PBB343-2017-CHA 17 April, 2017 27 April, 2017 FCA/1980/11/2017/9778
32 Diversion of 2.154 ha of forest land in favour in Punjab PWD B&R widening of Ropar-Abiana-Nurpurbedi road from 0.510 km to 4.10 from Ropar Head works to village Lower Garhbagga under forest Division and Distt. Rupnagar. 9-PBB419-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/226/2016/6906
33 Diversion of 0.108 ha of forest land for construction of 220 KV line transmission line lilo of 220 kv Ferozepur road Ludhiana Humbran at 220 KV sub station Ladhowal on D/c Tower in favour of PSTCL under Forest Division and Distt Ludhiana 9-PBB465-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/259/2016/1098
34 Diversion of 1.87 ha of forest land required for road widening of Badal-Meh road km. 2.1 to 5.4 (Kassi Pul to Drain Pul) The Malout Distt. Muktsar under Muktsar Forest division. 9-PBB481-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/345/2016/9013
35 Diversion of 0.0095 ha of forest land for access road to the proposed retail outlet of Essar Oil Ltd. Situated at village Mataur in km. 37.500 L/s on Sh-22 (new Nh-503) on Ropar-Nagal road Tehsil-Anandpur Sahib under forest division and distt. Rupnagar. 9-PBB485-2016-CHA 17 April, 2017 27 April, 2017 FCA/1980/311/2016/9078
36 Diversion of 2.18535 ha (additional area of km. 207.670 to 208.870 & Km 227.750) of forest land in favour of Executive Engineer, Central Works Divn. No.1 Bahinda for improvement of widening, strengthening raising & fore lanning Barnala-Mansa-Sardulgarh-Sirsa road Nh-703 km. 200.950 to 221.850 & 227.750 to 234.620 under forest division Mansa, Distt. Mansa, Punjab. 9-PBB316-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/21/2017/9549
37 Diversion of 0.225 ha of forest land for construction of 2 spam 8 mtr each type bridge over wahabwala drain x-ing DHS road NH-10 (new Nh 9) section Dabwali Malout at km/RD 324.400 in the state of Punjab 9-PBB344-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/05/2017/9633
38 Diversion of 0.225 ha of forest land for construction of 2 spam 8 mtr each type bridge over wahabwala drain x-ing DHS road NH-10 (new Nh 9) section Dabwali Malout at km/RD 324.400 in the state of Punjab 9-PBB344-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/05/2017/9633
39 Diversion of 2.772 ha of forest land required for road widening and Strengthening of Malout-Fazilka road at km stone no 21.34.86 B/s Distt Fazilka under Forest Divsion Mukatsar Sahib 9-PBB354-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/03/2017/9638
40 Diversion of 1.96 ha of forest land in favour of PSPCL for construction of 66 KV Transmission Line from 132 KV Sub-Station Banga road Phagwara to 33 KV Sub-Station GT Road under forest division Jalandhar and Distt Kapurthala Punjab 9-PBB357-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/358/2016/46
41 Diversion of 0.006967 ha of forest land for permission for approach road to Tube Investment of India (Unit Tube Products of India) at Village Sandharsi on Seel-Ghanour-Shambhu road KM 25-26 L/s Tehsil Rajpura under forest division and distt Patiala Punjab 9-PBB355-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/PBIP/50/2017/09
42 Diversion of 0.0083 ha of foret land permission for approach road to showroom of Smt. Satwant Kaur on Chandigarh-Patiala road RD over Bridge to Liberty chowk L/s Tehsil Rajpura Distt. Patiaa under forest division and Distt Patiala, Punajab 9-PBB356-2017-CHA 17 April, 2017 28 April, 2017 FCA/1980/303/2016/58